Note: Member is referred to often in these descriptions. A member is an underground facility owner that is a member of Sunshine State One Call (SSOCOF). A locate technician is someone who locates and marks underground facilities for a member.
1 Marked A locate technician has been to your excavation site and marked the approximate horizontal location of underground facilities within the boundaries described on the ticket.
2A Marked with Exceptions High profile utility in conflict; utility owner will attempt to contact you to schedule site surveillance An underground facility that delivers services to a large number of people or that could cause major problems if hit (i.e. fiber optic line, gas line, etc.) is within your excavation site. While the locate technician has marked the approximate horizontal location of the facility, the utility or its locate technician want to be present during any excavation near that facility. The utility will attempt to contact the excavator to determine when excavation will take place.
2B Marked with Exceptions Privately owned facilities on property; contact private facility owner directly A utility or its locate technician has located and marked its underground facility, but other facilities of that same type are in the area and were not marked because the utility claims no responsibility for locating them. This happens most often with customer-owned service lines.
3A Unmarked Locate technician could not gain access to property; call utility to schedule access. Excavation site is unmarked. A utilitys locate technician was sent to the excavation site, but was unable to access the area to be marked due to a locked gate, blocked entrance, guard dog or other circumstance prohibiting entry. Call the utility to re-schedule a time when the entrance will be open.
3B Unmarked Incorrect address information. Call SSOCOF to verify the information on the ticket. Excavation site is unmarked because the address could not be found. Please call 811 or (800) 432-4770 to verify the address information and make adjustments to the ticket as necessary.
3C Unmarked Locate technician and contractor (excavator) have agreed to meet on site on a specified date. Excavation site is unmarked. The locate technician and excavator negotiated an alternate time to meet at the excavation site.
3D Unmarked High profile utility in conflict; utility owner will attempt to contact you to schedule site surveillance. Excavation site is unmarked. An underground facility that delivers services to a large number of people or that could cause major problems if hit (i.e. fiber optic, gas or electric line, etc.) is located near your excavation site. The utility or locate technician want to be present during any excavation near that facility and will mark as necessary. The owner will contact the excavator to determine when excavation will take place.
3F Unmarked Marking delay requested by locate technician and agreed to by excavator per agreement. Excavation site is unmarked. The locate technician cannot mark within two full business days. The excavator was contacted and a new deadline was scheduled.
3H Unmarked Privately owned facilities on property, contact private facility owner directly. Excavation site is unmarked. A locate technician went to the excavation site and found none of the facility owners lines there; however, there are lines of a similar facility located in that area which are considered privately owned. This happens most often with customer-owned service lines.
3M Unmarked Marking instructions are unclear; call the utility to clarify the marking instructions. Excavation site is unmarked. The marking instructions on the locate ticket are not clear. The description may not make sense or the description may not match what the locate technician sees at the excavation site. Contact the utility to provide clarification.
3N Unmarked Locate description is insufficient - white lining is required per s. 556.105(5)(a), F.S. Please contact the utility when white lining is completed. Excavation site is unmarked. Based on the written description on the ticket, the locate technician could not determine the exact area that needed locating. White lining is required per s. 556.105(5)(a) when the written description of the area to be located is not understandable, when the excavation site is less than 500 feet in length, and when the marks don't interfere with traffic or pedestrian control (i.e. placing white marks on the ground could be confused with the lines already on pavement directing pedestrian and car traffic).
3P Unmarked Utility does not have accurate information to perform the requested locate - please contact the utility for further details per s. 556.105 (7)(a), F.S. Excavation site is unmarked. A utility does not have accurate information about the location of those underground facilities. The utility is required, however, to give the excavator the best available information.
3R Unmarked The excavator has performed the excavation prior to the locator's arrival. Excavation site is unmarked. A locate technician went to the excavation site, but the excavation work had already been completed.
3T Unmarked Extraordinary circumstances per s.556.105(8)(a) exist; call utility owner/operator provider for this location. Excavation site is unmarked. The utility has declared extraordinary circumstances through SSOCOF per s.556.105(8)(a) that render them unable to respond to your locate request. Extraordinary circumstances indicate situations other than normal operating conditions such as a natural or man-made disaster.
3U Unmarked Not service provider for this location. Excavation site is unmarked. Another company provides the services at this location. (i.e. Two phone companies provide services near the area where excavation will occur. Only one provides service at the exact excavation site. The company that does not provide service within the exact excavation site would use this code.)
3W Unmarked Work is being performed by the utility and the excavator will mark the underground lines per agreement.
4 Clear, no facilities The utility has no facilities at the specified excavation site.
5 No conflict, utility is outside of the requested work site The utility has a facility near the excavation site, but it is not within the area that was either described on the ticket or white lined.
6a Active facilities are present The member has active facilities within the area described by the noticed demolition. Do not demolish until the member notifies you the site is clear.
8 Ongoing job, locate technician and excavator have established an agreement on scheduled marking.
Please go to http://www.callsunshine.com/ for more information and updates. |